BARTS HEALTH - NHS TRUST

Activity: Long-term Maintenance Support

Overview:

Following the successful design and build of stem cell suites at the Royal London in 2012, Atlas was selected in 2014 as the preferred contractor for the new Radio/Aseptic pharmacy projects at the prestigious ‘Barts Hospital’ complex.

The full design brief incorporated the installation of a radio pharmacy and aseptic cleanroom suites to Grade B GMP across  two floors of the new Hospital with the total value of the works approaching £1.3 million.

Atlas has continued to provide full planned and reactive services to the facility at Barts & The Royal London and, in 2019, a new 3-year maintenance contract was secured to provide high-grade compliance testing of the containment facilities

Atlas’ reputation for maintaining the highest of standards was confirmed when invited to speak at the Symposium on Radio-pharmacy Design, attended by 150 delegates from around the world, and included tours of the facility.

1/1

© 2020 Atlas Sterile Services Limited. Created by The Atelier Agency.

Logo ASSL PNG.png
tjolly.png